N15/02 Motorway Section Wangen – Uster East
We are pleased to have been chosen to support the FEDRO Winterthur branch in the N15/02 UPlaNS Wangen – Uster East motorway maintenance project. The project covers several departments, and the separation of maintenance, renovation and newbuilding measures presents particular challenges.
Integration Projects4P in R+R Burger und Partner AG
R+R Burger und Partner AG has taken over the Projects4P brand and integrated it as a new business unit.
Projects4P was founded and built up by our management board member Stefan Isler.
The services of the Projects4P division include project management consulting, project management training and interim project management.
These three elements are based on the innovative 4P Dynamo concept. This is based on a wealth of experience and includes a comprehensive and structured approach to develop project management skills in organizations in the long term.
Projects4P ideally complements the existing offering of R+R Burger und Partner AG.
While R+R Burger und Partner AG has made a name for itself in the management and cost consulting of infrastructure projects, Projects4P focuses on the individual development of maturity in project management of project-oriented organizations.


N06.24 NEB EM Brüggmoos – Lyss-Süd motorway maintenance project
We are very pleased that we have been asked to support FEDRO’s Thun branch in the N06.24 NEB EM Brüggmoos – Lyss-Süd motorway maintenance project during in the next years in our function as management support and senior construction management. The repair work on this motorway section includes a replacement of the pavement and extensive measures on the engineering structures. Actual construction work is planned for 2029.
Research project bicycle traffic exposure
R+R is working together with the ZHAW and Pro Velo on the FEDRO research mandate MFZ_20_04E_03 Measurement of exposure to bicycle traffic until spring 2026. The aim of this research project is to evaluate existing methods for determining the mobility behavior of cyclists and to test a promising approach in a pilot study in practice. It involves determining the exposure, i.e., the distances traveled by cyclists, divided into the use of bicycles and e-bikes. Existing bicycle counts will also be integrated into the pilot study. Based on the findings, a proposal for the future calculation of exposure in bicycle traffic in Switzerland will be developed.
N15/02 Motorway Section Wangen – Uster East
Integration Projects4P in R+R Burger und Partner AG
N06.24 NEB EM Brüggmoos – Lyss-Süd motorway maintenance project
Research project bicycle traffic exposure
A1 OHRINGEN – OBERWINTERTHUR MEASURES TO OPTIMIZE TRAFFIC FLOW
During peak hours, the motorway section between Winterthur Ohringen and Oberwinterthur is highly congested. To ensure a stable flow of traffic, as well as to minimise potential backlog at the junctions, measures are being taken by the Federal Roads Office to improve and optimise the traffic situation. In addition, constructional adjustments are being made and traffic signal systems are being installed at the junctions.
Section 48 on the national motorway A1 between Winterthur Ohringen and Oberwinterthur ranks among the most congested motorway sections in Switzerland. Stretching 4.3 kilometers, it is jammed during peak hours on a nearly-daily basis. This bears negative consequences for the road networks of the Winterthur city agglomeration. The implementation of measures to optimise traffic flow is due to alleviate congestion during peak hours on both the motorway and secondary road networks, as well as to minimise the risk of accidents. Amongst other things, these measures include extensions of the Oberwinterthur motorway junction and the acceleration lane at Forrenberg service station, the widening of existing emergency bays and the installation of a total of 19 signalling portals. The total costs of the project amount to 29 million Swiss francs. In order to prevent traffic backlog at the junctions, constructional adjustments are undertaken and new traffic signal systems are being installed at the junctions Winterthur Ohringen and Oberwinterthur.
The scheduled measures serve as an interim solution until the 6-lane extension between Winterthur Töss and the intersection Winterthur Ost will be commissioned. Current plans call for the motorway extension to be implemented between 2035 and 2040. Holding mandates as project-owner support unit and construction supervisor, R+R has been providing assistance to the general project management team of the Federal Roads Office since early project stages. In this capacity, R+R supports and advises the general project management team in project management, project controlling and in other selected issues.
Client
Federal Roads Office (FEDRO)
Processing period
2017 – 2021
Project costs
about 29 Mio. CHF
Project type
Road
Services
Project Management
Fields of expertise
Strategic Planning
Project Planning and Organization
Project Controlling
Procurement
Professional Support
Communication Support
Downloads
Project sheet
Contact

Christoph Marti
Consultant, Project manager, managing director, member of the board of directors